Text · page 1 of 3
Read the whole document on one page (all 3 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
TOWN OF ELMA PLANNING BOARD 1600 Bowen Road, Elma, New York 14059 Phone: 716-652-3260 MINUTES OF REGULAR MEETING ~June 16, 2026 The Regular Meeting of the Town of Elma Planning Board, hereinafter referred to as the EPB, was held on Tuesday, June 16, 2026, at 7:04 PM in the Elma Town Hall at 1600 Bowen Road, Elma, New York. PRESENT: ABSENT: Chairman Michael Cirocco Member Michael Cleary Member James Millard Member Gregory Merkle Member Robert Waver Member Charles Putzbach Alternate James Lembke Raymond Balcerzak - Asst Building Inspector TOWN. REPRESENTATIVES PRESENT Phyllis Todoro - Town Attorney James Wyzykiewicz — Town Engineer I. Approval of Regular Meeting Minutes from May 19, 2026 Mr. Millard motioned to approve the Minutes of the EPB Regular Meeting held on May 19, 2026. Mr. Lembke 2nd motion. Motion approved. I. Site plan review for a 60’ x 115’ storage building for Cellino Plumbing @ 611 Bullis Rd Applicant : Lucas Cellino Mike Berger from Sutton Architecture, representing Cellino Plumbing, spoke about plans for a 6,900 sq. ft. pole barn at the rear of the lot behind existing building. Building will be used for material storage, loading/unloading trucks. The existing building will remain as an office. The adjacent house on same property will be removed, and a new parking area will be created. Revisions from prior submission included correcting address to 611 Bullis Road and removing property merger on plans, there were no substantial changes. The EPB reviewed the checklist: Setbacks appear compliant; lighting addressed; informational wetlands currently tied up in court—building department confirmed none on site; septic location shown (front of two-story building); landscaping added (front of building and around septic); no new water service; no dumpsters proposed. The EPB reviewed the short form SEQR. Michael Cirocco made a motion to check box #2 on the SEQR; the motion was seconded by Robert Waver. Yes-4 No-0 Motion Carried A motion was made by James Millard and Seconded by James Lembke to give final site plan approval contingent on approval from the fire department. Yes-4 No-0 Motion Carried