Town of Elma Planning Board Minutes (6/16/2026) Page 3 IV. Site plan review for an addition and pavilion to Crossroads Christian Church @ 1050 Girdle Rd Applicant Pat Kleitz (Continued) Signage: No changes to ground signage; permit application to proceed as needed. Landscaping: Dumpster enclosure: Located in the southwest corner of the parking lot; screening addressed in plans. Water Service & Septic System: Discussion with water department indicates adequate 6-inch water line; no final letter on file. Septic: System to be updated; county health approval pending. Fire Department: Fire hydrant located in the lower southeast corner. Contact attempts have been ongoing for several months; approval pending still needs approval letter from the fire department. SEQR Application updated to “build a 19,800 sq ft church addition and 520 sq ft pavilion”; applicant initialed SEQR changes The EPB reviewed the short form SEQR. Michael Cirocco made a motion to check box #2 on the SEOR; the motion was seconded by Robert Waver. Yes-4 No-0 Motion Carried A motion was made by Robert Waver and Seconded by James Lembke to give final site plan approval contingent on approval from fire department and Erie County Health Department. Yes-4 No-0 Motion Carried Site plan review to convert an existing 2-unit dwelling to_a 4-unit dwelling @ 6177 Seneca St Applicant Todd Huber Applicant not present; item not discussed or moved forward. Adjourn Motion to adjourn at 7:43 PM by unanimous consent. Respectfully submitted, Barbara Blair Elma Planning Board Secretary