Southtowns Record

June 16, 2026 Minutes

Government
Town of Elma
Board
Planning Board
Meeting
Jun 16, 2026
Kind
Minutes
Topics
Zoning and land use, Water, sewer and drainage, Public safety

Original document

Same meeting

Motions and votes

Copied word for word from these minutes. Who moved and seconded, the tally and the roll call appear only where the minutes state them. Picked out automatically: the minutes themselves are the record. All votes for this government.

  1. The EPB reviewed the short form SEQR. Michael Cirocco made a motion to check box #2 on the SEQR; the motion was seconded by Robert Waver. Yes-4 No-0 Motion Carried

    Carried · Moved by R. Michael Cirocco, seconded by Robert Waver

    Page 1 of the minutes, motion 2

  2. A motion was made by James Millard and Seconded by James Lembke to give final site plan approval contingent on approval from the fire department. Yes-4 No-0 Motion Carried

    Carried · Moved by James Millard, seconded by James Lembke

    Page 1 of the minutes, motion 3

  3. A motion was made by Michael Cirocco and Seconded by James Lembke to give preliminary site plan approval Yes-4 No-0 Motion Carried

    Carried · Moved by Michael Cirocco, seconded by James Lembke

    Page 2 of the minutes, motion 4

  4. The EPB reviewed the short form SEQR. Michael Cirocco made a motion to check box #2 on the SEQR; the motion was seconded by Robert Waver. Yes-4 No-0 Motion Carried

    Carried · Moved by R. Michael Cirocco, seconded by Robert Waver

    Page 2 of the minutes, motion 5

  5. A motion was made by James Millard and Seconded by James Lembke to give final site plan approval contingent on approval of Special Use Permit by the Elma Town Board. Yes-4 No-0 Motion Carried

    Carried · Moved by James Millard, seconded by James Lembke

    Page 2 of the minutes, motion 6

  6. The EPB reviewed the short form SEQR. Michael Cirocco made a motion to check box #2 on the SEOR; the motion was seconded by Robert Waver. Yes-4 No-0 Motion Carried

    Carried · Moved by R. Michael Cirocco, seconded by Robert Waver

    Page 3 of the minutes, motion 7

  7. A motion was made by Robert Waver and Seconded by James Lembke to give final site plan approval contingent on approval from fire department and Erie County Health Department. Yes-4 No-0 Motion Carried

    Carried · Moved by Robert Waver, seconded by James Lembke

    Page 3 of the minutes, motion 8

1 routine motion (minutes, bills, agenda, adjournment…)
  1. Mr. Millard motioned to approve the Minutes of the EPB Regular Meeting held on May 19, 2026. Mr. Lembke 2nd motion. Motion approved.

    Carried · Moved by Mr. Millard

    Page 1 of the minutes, motion 1

Text · page 2 of 3

Read the whole document on one page (all 3 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

Town of Elma Planning Board Minutes (6/16/2026)
  Page 2

I.  Site plan review for a 50’ x 80’ addition for Transit Auto Detail @ 2161 Transit Rd
  Applicant Al Hassan

  The applicant, Al Hassan, plans a used car sales, towing, auto repair, and collision service business at
  2161 Transit Road The entire lot in C-3 with the automotive overlay. A Special Use Permit (SUP) has
  been applied for and is on Town Board agenda for 06-17-2026. The EPB reviewed the Checklist. Checklist
  updates: submitted updated site plan with revised dimensions and layout; garage removal shown; lighting
  locations/specs provided; parking dimensions/layout provided; stormwater direction/management shown;
  no wetlands identified (confirmed by building department); town engineer reviewed and approved
  drainage plan; signage to be building-mounted (no pole signs); sign location on front/main part of existing
  building; sign must meet code based on building size and requires permit; landscaping identified; nearest
  fire hydrants off-site; No water service needed for new building, no new bathrooms.

  A motion was made by Michael Cirocco and Seconded by James Lembke to give preliminary site plan
  approval  Yes-4 No-0 Motion Carried

  The EPB reviewed the short form SEQR. Michael Cirocco made a motion to check box #2 on the SEQR;
  the motion was seconded by Robert Waver.  Yes-4 No-0 Motion Carried

  A motion was made by James Millard and Seconded by James Lembke to give final site plan approval
  contingent on approval of Special Use Permit by the Elma Town Board. Yes-4 No-0 Motion Carried

IV.  Site plan review for an addition and pavilion to Crossroads Christian Church @ 1050
  Girdle Rd  Applicant Pat Kleitz

  Douglas Klotzbach from K2 Architecture presented a revised site plan for the Crossroads Church
  expansion. Key changes include reducing the size of the initial addition to only including a multi-purpose
  room and entry area. Building a new pavilion/open, pole-barn style structure for summer use was added
  to the plan. The original plan was presented and given preliminary approval at the May 2026 meeting. The
  EPB reviewed the check list for outstanding items.

  The
  checklist:
  Site & Building Details: added building dimensions to plans: Pavilion will screen lower east elevation;
  window visibility considered with reduced pavilion pitch.
  Lighting: Added additional fixtures on the backside of the multi-purpose building; other lighting
  remains in place.
  Parking: Expect increased traffic due to building size; existing traffic assistance is already in place, and
  site is sufficiently distant from signalized intersection.
  Drainage: Engineering drainage drawings reviewed by Jim; no concerns. Drainage district: Prior minutes
  noted investigation into creation/extension; status discussed, believed to be fine; clarify existence as
  needed.