Text · page 2 of 3
Read the whole document on one page (all 3 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
Town of Elma Planning Board Minutes (6/16/2026) Page 2 I. Site plan review for a 50’ x 80’ addition for Transit Auto Detail @ 2161 Transit Rd Applicant Al Hassan The applicant, Al Hassan, plans a used car sales, towing, auto repair, and collision service business at 2161 Transit Road The entire lot in C-3 with the automotive overlay. A Special Use Permit (SUP) has been applied for and is on Town Board agenda for 06-17-2026. The EPB reviewed the Checklist. Checklist updates: submitted updated site plan with revised dimensions and layout; garage removal shown; lighting locations/specs provided; parking dimensions/layout provided; stormwater direction/management shown; no wetlands identified (confirmed by building department); town engineer reviewed and approved drainage plan; signage to be building-mounted (no pole signs); sign location on front/main part of existing building; sign must meet code based on building size and requires permit; landscaping identified; nearest fire hydrants off-site; No water service needed for new building, no new bathrooms. A motion was made by Michael Cirocco and Seconded by James Lembke to give preliminary site plan approval Yes-4 No-0 Motion Carried The EPB reviewed the short form SEQR. Michael Cirocco made a motion to check box #2 on the SEQR; the motion was seconded by Robert Waver. Yes-4 No-0 Motion Carried A motion was made by James Millard and Seconded by James Lembke to give final site plan approval contingent on approval of Special Use Permit by the Elma Town Board. Yes-4 No-0 Motion Carried IV. Site plan review for an addition and pavilion to Crossroads Christian Church @ 1050 Girdle Rd Applicant Pat Kleitz Douglas Klotzbach from K2 Architecture presented a revised site plan for the Crossroads Church expansion. Key changes include reducing the size of the initial addition to only including a multi-purpose room and entry area. Building a new pavilion/open, pole-barn style structure for summer use was added to the plan. The original plan was presented and given preliminary approval at the May 2026 meeting. The EPB reviewed the check list for outstanding items. The checklist: Site & Building Details: added building dimensions to plans: Pavilion will screen lower east elevation; window visibility considered with reduced pavilion pitch. Lighting: Added additional fixtures on the backside of the multi-purpose building; other lighting remains in place. Parking: Expect increased traffic due to building size; existing traffic assistance is already in place, and site is sufficiently distant from signalized intersection. Drainage: Engineering drainage drawings reviewed by Jim; no concerns. Drainage district: Prior minutes noted investigation into creation/extension; status discussed, believed to be fine; clarify existence as needed.