Town of West Seneca
  Gary Dickson, Supervisor
  Jason Foote, Town Engineer

  QA/QC
  Project Director  Project Manager
  John Story, PE*
  Robert Lannon, Jr., PE*  Edward Bradfuhrer, PE*  David Woolley*

  Key Technical and Discipline Leads/Subconsultants

  Water & Sewer Modeling  Linear Design  Funding Advisor
  Edward Bradfuhrer, PE*  Paige Gilliam, EIT*  Jaron Case, PE*
  Connor Bannochie  Brandon Nowakowski, PE
  Environmental Services
  Linear Assessments  Site/Civil/Stormwater Design  Katherine Galanti
  Edward Bradfuhrer, PE – Sewer*  Camie Jarrell, PE*  Bethanne Weyenberg, PE
  Tyler Pitts, EIT PACP  Sam Koplas
  Wetland Delineation
  Jacob Kocic, EIT – Water*
  Structural  Greg Kunka
  Stormwater Permitting/SWPPPs  Kyle Lantzy, PE
  Camie Jarrell, PE*  Brian Regan  MWBE Subconsultants
  Jaron Case, PE*
  Process-Mechanical Design  Arold Construction Company, Inc. (WBE)
  Regulatory/Permitting  Matthew Skuse, LEED AP BD+C  CCTV/Smoke Testing
  Lisa Derrigan, PE*
  Electrical/Energy
  Jacob Kocic, EIT*  JM Davidson Engineering, DPC (WBE)
  Steve Bochnowicz, PE  Civil Engineering/Resident Inspection
  GIS Services  Stephanie Altherr
  Todd Plank*
  Instrumentation/Controls  Jade Stone Engineering (WBE)
  Miranda Girton
  Michael O’Donnell  Electrical Engineering
  Brian Casillo
  Construction Phase Services
  Daniel Kolkmann*
  David Woolley

Figure 5.1 – Team Organizational Chart (* Resumes Provided in Appendix A)

  GHD | Town of West Seneca | 12681649 | Engineering Services for Water and Wastewater Projects  13

  Page 136 of 301