ECSD No. 3 Board of Managers
  December 3, 2025 Meeting Minutes
  Page 4 of 5

Contract No. 82 (Southtowns AWTF Landfill Reclamation) - This project was necessary to
provide site availability for excavated materials during the Phase 2 Expansion construction.
Construction is complete and a final walk through was performed on Wednesday, November
26,2025. Formal closeout will be requested at the next meeting, or by email poll.

Contract 84 - Elma Force Main Air Release Valve Replacement - STC Construction
commenced work on this project in November. A new doghouse manhole was installed on
Jamison Road east of Bowen Road. Due to manufacturer delays, the work to replace the two
(2) deteriorated air release valves is anticipated to be delayed until spring 2026. A no-cost
time extension is anticipated to be recommended, as the current project completion date is
December 14,2026.

Contract 95 (CIPPL Term Contract) (USI/Kenvon Pipeline) - United Survey continued
cured-in-place pipe lining (CIPPL) work under Work Order (WO) 8U which includes I1,420
linear f-eet of 8-inch, 10-inch and l2-inch diameter Vitrified Clay Pipe (VCP) and Asbestos
Cement Pipe (ACP) sewerlines on various streets in the Town of Hamburg (including
Amsdell Road, Orchard Ave., Lyndale Ave., Hawthome Ave., Greenfield Ave., Femdale
Ave., Southcrest Ave., Oakwood Ave., Lakewood Ave., Riverton Ave.. Woodlawn Ave., and
Glendale Ave.). Kenyon Pipeline continued lining work under WO l5K which includes
13,394 linear feet of S-inch diameter VCP sewers on Amsdell Road and Crestridge in the
Town of Hamburg; various VCP sewerlines in the Village of Hamburg (Evans St., Central
Ave., Long Ave., S Buffalo St., Center St., Woodview Ave., Highland Ave.). The work
order also includes one pipe patch on an easement along Abbott Road near the
Hamburg/Orchard Park boundary.

Contract 96 (Multi-District) - Sanitary Sewer Open Cut ReDair Tenn Contract - (Visone
Construction) - In November , Visone Construction replaced approximately 96 linear feet of
8-inch diameter sanitary sewer on Pleasant Ave. at Church St. in the Village of Hamburg.
The existing sewerline had a poor and meandering alignment, cracked pipe under Church St.,
and a large hole and void at the side of the pipe wall. If final restoration cannot be completed
this fall due to weather conditions, then temporary pavement will be placed and final
restoration will occur in the spring.

Contract 99 (Multi-District )( Sani tarv Sewer Trunkline Insoection Service Contract ) - the
DSM reviewed inspection deliverables prepared by Red Zone Robotics for sewer inspection
work performed in September. In ECSD No. 3, the first location consisted of sewers
extending from Milestrip Road to McKinley Parkway (approximately 5,900 LF - various
diameters ranging between I S-inch and 42-inch). It is anticipated that a portion of these
sewers will be recommended for rehabilitation based on condition, particularly Reinforced
Concrete Pipe (RCP) between Milestrip and Lake. The second location consisted olsewers
extending from Big Tree Road to Southwestem Boulevard (approximately 5,700 LF -
various diameters ranging between l2-inch and 21-inch), including locations behind the Bills
stadium. Rehabilitation recommendations are being made based on condition.