Text · page 64 of 104
Read the whole document on one page (all 104 pages, each with its own heading)
Item c. CAMCO GENERAL CONTRACTING INC. PROPOSED CHANGE ORDER 10994 Tinkham Road Phone: (585)547-3898 No. 6 Darien, New York 14040 Fax: (585)547-3855 TITLE: Grading Scope Credit DATE: 05/26/2026 PROJECT: HAMLIN TOILET ROOM ADDITION IN HAMLIN PARK TO: Attn: Matthew Fuller Barton & Loguidice, D.P.C. ORIG: Owner Request 11 Centre Park, Suite 203 SUBMITTED: Rochester, New York 14614 COMPLETED: Phone:(585) 325-7190 REQUIRED: DESCRIPTION The Village has decided to self-perform the remaining grading on site as part of a greater effort to correct issues with existing utilities and drainage. Num Item Description Ref Qty Unit Unit Price Amount 1 312200 Credit 60% of Original Grading -1.000 LS 3,360.00 -3,360.00 Line Item 2 321500 Credit 100% of Stone Walking -1.000 LS 1,050.00 -1,050.00 Path Labor & Materials 3 329219 Credit 100% of Seeding -1.000 LS 500.00 -500.00 Item Total: ($4,910.00) Total: $0.00 Total: ($4,910.00) Exclusions: 1) Village to self-perform all remaining grading, seeding, and walkway treatments as of 5/26/2026 APPROVAL By: By: Cameron P. Sitarek Date: 05/26/2026 Date: