Text · page 65 of 104
Read the whole document on one page (all 104 pages, each with its own heading)
Item d. CAMCO GENERAL CONTRACTING INC. PROPOSED CHANGE ORDER 10994 Tinkham Road Phone: (585)547-3898 No. 7 Darien, New York 14040 Fax: (585)547-3855 TITLE: Additional Roof Accessories DATE: 05/26/2026 PROJECT: HAMLIN TOILET ROOM ADDITION IN HAMLIN PARK TO: Attn: Matthew Fuller Barton & Loguidice, D.P.C. ORIG: Owner Request 11 Centre Park, Suite 203 SUBMITTED: Rochester, New York 14614 COMPLETED: Phone:(585) 325-7190 REQUIRED: DESCRIPTION The Village has requested a proposal to add a gutter and a snow-guard to the eave above the bathroom doorways. Num Item Description Ref Qty Unit Unit Price Amount 1 076000 New Gutter Materials 1.000 LS 400.00 400.00 2 076000 New Snow Guard Materials 1.000 LS 160.00 160.00 3 076000 Roof Accessory Installation Labor 10.000 MH 90.00 900.00 4 100000 CamCo OH&P (20%) 1.000 LS 292.00 292.00 Item Total: $1,752.00 Total: $0.00 Total: $1,752.00 Exclusions: 1) 1.5" tall continuous snow guard rail to be "Hunter Green" provided by House of Steel (Springville, NY) 2) Gutter to be "Grecian Green" provided by SRS Building Products (Buffalo, NY) 3) Gutter to be 5" wide K-Style gutter with one 2"x3" downspout APPROVAL By: By: Cameron P. Sitarek Date: 05/26/2026 Date: