Southtowns Record

Town Board agenda packet — January 26, 2026

Government
Town of Aurora
Board
Town Board
Meeting
Jan 26, 2026
Kind
Agenda packet
Topics
Budget and taxes, Public safety, Zoning and land use, Water, sewer and drainage, Parks and recreation, Moratoriums, Roads and traffic, Audits and oversight, Energy and data center siting

Original document

Same meeting

Text · page 17 of 63

Read the whole document on one page (all 63 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

(PONTANESE
  FOLTS
“AUBRECHT,  FONTANESE FOLTS AUBRECHT ERNST ARC
  6395 WEST QUAKER STREET, ORCHARD PARK, NY 1avz7
  wp. 716/882-2200  |  f: 716/662-0072  1  Email: [email protected]

November 17, 2025

Mr. Charles Snyder — Supervisor
Town of Aurora
575 Oakwood Avenue
East Aurora, NY  14052

RE:  Town of Aurora Court — Construction Documents Proposal

Dear Supervisor Snyder,

Included within is our proposal to provide Professional Architectural and Engineering Services to
complete Construction Documents for the reference project, based on the prior completed Feasibility
Study. The goal of the renovations is to improve the security and efficiency of the layout and operations,
while also developing a more professional aesthetic for the Court space.

Architectural Project Scope :

  Field verify existing conditions.
  Meetings will Town.
  Verify and update program as necessary.
  Develop Architectural Construction Documents to secure bids and permitting.
  Assist the Town with procurement.
  Review bids and make recommendations.
  Construction Administration (up to (4) construction meetings, review shop drawings, review
  pay applications).

Engineering Project Scope :

Mechanical Systems:

* Design of complete HVAC systems for all occupied spaces, including load calculations,

 equipment sizing, and energy code compliance.

* Ventilation design per ASHRAE  and NYS Mechanical Cade standards.

* Minimal modification of existing steam radiators as needed for space revisions.

* Design of air conditioning associated with waiting room and two conference rooms.

* Coordination of ceiling devices associated with new ceiling grid and system.