Engineer’s Report  December 2025

  TABLE OF CONTENTS

I.  INTRODUCTION .............................................................................PAGE 3

II.  DISCUSSION ....................................................................................PAGE 4
  A.  SANITARY SEWERS...........................................................PAGE 4
  B.  WATER ................................................................................PAGE 4
  C.  STORMWATER MANAGEMENT .....................................PAGE 5

APPENDICES

A. STORMWATER CALCULATIONS AND MODELS

    PRE-DEVELOPED DRAINAGE AREAS
    PRE-DEVELOPED HYDROCAD MODEL RESULTS
    POST-DEVELOPED DRAINAGE AREAS
    POST-DEVELOPED HYDROCAD MODEL RESULTS
    DRAINAGE INLET DRAINAGE AREAS
    STORM SEWER SIZING SPREADSHEET (DRAINAGE COMPUTATIONS)

B. WATERLINE CALCULATIONS AND MODELS

    HYDRANT FLOW TEST
    WATERCAD MODEL
    PEAK INSTANTANEOUS WATER DEMAND CALCULATION

EXHIBITS:

  1.  Project Site Location Map
  2.  NYSDEC Environmental Resource Mapper
  3.  FEMA Firmette
  4.  Site Soil Map
  5.  Cultural Resource Information System (CRIS) Map

Greenman-Pedersen, Inc.  GPI No. WNY-2500056.00  Page 2