Southtowns Record

5A.-ENGINEER'S REPORT

Government
Town of Aurora
Board
Town Board
Meeting
Feb 4, 2026
Kind
Other
Topics
Water, sewer and drainage, Zoning and land use, Public safety

Original document

Same meeting

Text · page 94 of 351

Read the whole document on one page (all 351 pages, each with its own heading)

WNY-2500056.00_HydroCAD  extreme_precip_tables_output (29) 24-hr S1 1-yr Rainfall=1.88"
Prepared by Greenman-Pedersen, Inc  Printed 12/18/2025
HydroCAD® 10.20-7a s/n 04560 © 2025 HydroCAD Software Solutions LLC  Page 19

  Subcatchment DA 3: Drainage Area 3
  Hydrograph

  0.36  Runoff
  0.33 cfs
  0.34
  extreme_precip_tables_output (29) 24-hr S1 1-yr
  0.32  Rainfall=1.88"
  0.3  Runoff Area=0.150 ac
  Runoff Volume=0.019 af
  0.28
  Runoff Depth>1.55"
  0.26  Flow Length=75'
  0.24  Slope=0.0100 '/'
  Tc=7.2 min
  0.22
  CN=97
  Flow (cfs)

  0.2
  0.18
  0.16
  0.14
  0.12
  0.1
  0.08
  0.06
  0.04
  0.02
  0
  0  1  2  3  4  5  6  7  8  9  10  11 12 13 14  15  16  17  18  19  20  21  22  23  24
  Time (hours)