Comprehensive Plan  29

What We Heard
  Key Issues &
  opportunities
Throughout the planning process,
residents and stakeholders of Aurora
were continuously engaged to ensure
the plan reflects their desires and
  “Opportunities” represent  “Issues” represent either
vision for the community. Engagement
opportunities included a public survey,  existing strengths or assets  existing needs or gaps in the
stakeholder interviews and focus  in the Town that can be  Town that limits to future
groups, and two public workshops.  further leveraged and  development or the Town
Regarding land use and zoning,  supports the potential for  from achieving the plan’s
Community members strongly valued
  new development, business  vision statement and goals.
Aurora’s rural character and voiced a
clear preference for preserving open  creation, or achieving the
space, managing growth carefully,  plan’s vision statement and
and updating zoning to reflect today’s  goals.  Infrastructure Limitations for
housing and business needs.  Future Growth: Expanding
  residential and commercial
•  Preserve Rural Character and  development could require
  Open Space: Residents support  West Falls Hamlet Overlay  significant investment in
  protecting farmland, forests, and  District Encourages Thoughtful  infrastructure, including water,
  scenic landscapes. Conservation  Growth: The West Falls Hamlet  sewer, and roads. The Town’s
  and open space were the top land  Overlay offers a strong framework  current rural land use pattern
  use priorities in the public survey.  for maintaining historical character  makes infrastructure expansion
  while promoting mixed-use  costly, so strategic infill
•  Limit and Focus Development:  development in a walkable  development where infrastructure
  Most respondents want to limit new  environment. This approach  already exists should be
  development entirely or direct it to  supports small businesses and  prioritized to maximize efficiency
  specific locations, such as near the  adaptive reuse of buildings. Similar  and minimize costs.
  Village of East Aurora or in existing  overlays could be considered for
  developed areas (i.e. hamlet of West  other Hamlets and historically  Traffic and Transportation
  Falls). Infill development and reuse  built-up areas in the Town.  Challenges Along Major
  of vacant parcels were preferred  Corridors: With commercial
  over expanding into rural or natural  Potential for Increased Housing  uses concentrated along NYS
  areas  Diversity in Higher-Density  Routes 240, 20A, and 16, there
  Residential Zones: The R-2 and  is potential for congestion and
•  Modernize Zoning: Many residents  R-3 zoning districts were intended  safety concerns, particularly
  and stakeholders called for  to support a mix of housing  if development increases. A
  updated zoning that supports  types, but single-family homes  lack of pedestrian and bicycle
  small-scale, context-sensitive  dominate. Encouraging duplexes,  infrastructure along these
  growth, allows accessory dwelling  triplexes, and multi-family housing  corridors’ further limits mobility
  units (ADUs), and enables mixed-  through zoning adjustments or  and access.
  use development in hamlets.  incentives could provide more
  affordable housing options
•  Infrastructure & Environmental  while accommodating changing
  Concerns: Residents stressed  demographics.
  that future development should
  align with existing infrastructure to  C-3 Zoning District as an
  avoid costly expansions. Concerns  Underutilized Asset for Economic
  included increased traffic, loss  Growth: The Town’s C-3 zoning
  of green space, and stormwater  district covers 332 acres, yet there
  impacts.  are no industrial land uses within
  it. This presents an opportunity to
•  Support Hamlet-Scale Growth:  attract targeted industries such as
  West Falls and other hamlets were  light manufacturing, technology,
  identified as appropriate places for  or green energy businesses, which
  modest, walkable development  could diversify the local economy
  that respects their historic scale and  and provide new job opportunities.
  character.