Comprehensive Plan  9

Other Planning Initiatives

Since the Town’s participation in the 2004 Regional Plan, several
other planning projects and initiatives have taken place at the
local, county, and regional level. These previous plans were taken
into consideration and helped inform the development of this
comprehensive plan update.

2010
Town of Aurora Open Space Plan
In 2007, the Aurora Town Board formed the Aurora Open Space
Committee with the mission of defining, inventorying, and evaluating
the Town’s priority open space resources. With the goal of preserving
an additional 1,500 acres of open space land in the Town from
development, the committee published the Town of Aurora Open
Space Plan in 2010. Components of the Open Space Plan included
informing the public about the importance of open space and how
it can be preserved, identifying parcels with high open space value,
developing a program for conservation measures, and identifying
sources of funding for preservation. Overall, the plan identified nine
distinct groupings of parcels covering approximately 4,000 acres of
land for conservation.

2019
Erie County Parks Master Plan Update
First completed in 2003, the Erie County Parks Master Plan 2019
update sought to identify ways to preserve, enhance, and improve
the nearly 10,000-acre park system the County manages. The Town
of Aurora is home to one of the County’s “heritage parks’, the 457-acre
multi-purpose Emery Park. The plan called out three overarching
park priorities: (1) preserve and enhance heritage areas and special
park features, (2) reduce lawn mowing, and (3) relocate the disc golf
holes to prevent damage to natural features. To accomplish these
three priorities, the plan recommends 91 actions items for Emery
Park.

2021
Southern Tier Trail Feasibility Study
In 2021, several trail and mobility advocacy groups partnered together
to study the feasibility of constructing the 80-mile Southern Tier Trail
which would connect residents across 20 cities, towns, and villages
throughout Erie and Cattaraugus County together, providing safe
and convenient access to recreational opportunities. The process
included an inventory of existing conditions, community engagement
to gather input on how the trail would be best used, and ultimately
a list of 23 project recommendations which would collectively see
the full 80-mile trail completed. Two project recommendations were
identified in the Town of Aurora, the West Falls Railroad Corridor and
the West Falls to Colden Railroad Corridor. The West Falls Railroad
Corridor would span 3.1 miles connecting the Hamlet of West Falls
northward to the already active Orchard Park Corridor. The West
Falls to Colden Corridor would span 4 miles and would connect the
Hamlet of West Falls southward to the Town of Colden.