Engineer’s Report  December 2025

II  Discussion

  A.  Sanitary Sewers

  1.  System Description and Design Flows

  The proposed building will be serviced by a six-inch PVC sewer lateral
  installed south of the Quaker Road ROW (US 20A) crossing through the
  property to the east within a twenty-foot private utility easement then
  crosses under Quaker Road (US 20A) to the existing sanitary manhole
  within the westbound lane. The existing sanitary manhole is owned and
  operated by the Village of East Aurora and is tributary to the East Aurora
  Water Resource Recovery Facility (WRRF) within ECSD #8. The East
  Aurora WRRF is roughly 1,200-feet east of the proposed site along Mill
  Street.

  The estimated maximum flow rate for the proposed building is based on
  250 gallons per day (gpd) per dental chair as per the New York State
  Design Standards for Intermediate Sized Wastewater Treatment Systems
  dated March 5th, 2014. The proposed building will have 7 dental chairs
  making the estimated maximum flow rate 1,750 gpd (7 dental chairs x
  250 gpd per dental chair) or 0.00175 million gallons per day (mgd). With
  the peak design flow being less than 2,500 gpd, a downstream sanitary
  sewer capacity analysis is not required.

  B.  Water

  1.  Domestic System Description and Design Flows

  Water service for domestic use will be provided by a new two-inch type
  ‘K’ copper waterline connecting to the ECWA existing twenty-inch
  prestressed concrete cylinder pipe (PCCP) watermain along Quaker
  Road (US 20A) and running to a new curb valve and box at the northerly
  property. From the curb box, the two-inch water service transitions to
  polyethylene tubing (DR-9) then runs to the proposed building’s
  mechanical room located in the southeast corner of the proposed
  building.

  The two-inch domestic water service to the building is sized to
  accommodate a peak instantaneous water demand of 42 gpm based on
  the various types and quantities of plumbing fixtures proposed for the
  Dental Office (See Appendix B).

  To protect the public water supply from any potential cross contamination
  from the private water service, a backflow prevention device (RPZ) and
  water meter assembly will be installed inside the building. The RPZ and
  meter assembly will be designed by others.

  2.  Fire System Description and Design Flows

Greenman-Pedersen, Inc.  GPI No. WNY-2500056.00  Page 4