Engineer’s Report  December 2025

  Fire protection for the proposed building will be provided by the existing
  hydrant in front of 270 Quaker Road approximately 250± feet northeast of
  the proposed building. The distance from the hydrant to the most remote
  portion of the proposed building (southwest corner) is approximately 475±
  feet. This exceeds the maximum distance of 400-feet per §507.5 Fire
  Hydrant Systems within the New York State Fire Code 2025. The Owner
  is currently seeking a variance from this code requirement through the
  NYS Department of State.

  3.  Hydraulic Analysis

  Hydraulic modeling of the existing water distribution system and proposed
  water service was conducted using the Bentley product WaterCAD to
  determine if the system is capable of sufficiently supplying the site with
  adequate pressures under the various design flows. The model was
  calibrated to match the results of a hydrant flow test (dated June 17 th
  2019) performed by the Erie County Water Authority on the existing fire
  hydrant (residual) in front of 431 Quaker Road approximately 850-feet
  west of the project site and the existing fire hydrant (flow) in front of 25
  Jewett Holmwood Road approximately 1,300-feet west of the project site.
  The results of their test are included in Appendix B and are summarized
  as follows: the main has a static pressure of 81 psi and 64 psi residual at
  the flow rate of 1,113 gpm during the hydrant flow test, with a flow of
  2,219 gpm at the minimum required residual pressure of 20 psi. A water
  analysis was performed using this flow test data, the various flow
  scenarios concluded that there is sufficient pressure and flow available for
  the proposed development.

  The results of the critical nodes within the model are displayed below:

  Distribution
  System
  Water Service
  Residual
  Scenario  Residual
  Pressure at
  Pressure at J-4
  Ex. Hyd.
  (270 Quaker Rd)
  Maximum Demand  77  81
  Max. Demand with Fire Flow  54  56

  The required water distribution system design pressures per Section 8.2.1
  of the “Recommended Standards for Waterworks, 2018 Edition” are as
  follows:

  1. Minimum normal operation pressure:  35 psi
  2. Maximum normal operation pressure:  80 psi
  3. Minimum pressure in main under fire flow:  20 psi

  As shown in the previous table, the system as modeled meets these
  requirements.

  A full print out for the hydraulic model under various scenarios including
  tables and an exhibit map can be found in Appendix B.

Greenman-Pedersen, Inc.  GPI No. WNY-2500056.00  Page 5